Project title | Executive operation of pumping station, transmission line and distribution of farming water of Golfaraj dam |
Contractee | East Azerbaijan regional water company |
Date & Location | Golfaraj,Aras Free Zone,East Azerbaijan Province-2010 |
Preparation of the materials and implementation of primary and secondary pumping buildings and preparation and installation of electromechanical equipment of pumping – preparation of materials and implementation of water storage tanks of pumping stations – piping with steel pipes of 500 to 1600 mm of diameter and 16 km long – piping with poly ethylene pipes of 110 to 710 mm of diameter and 39 km long - implementation service road |