• HOME
  • ABOUT US
    • HISTORY
    • Board of directors
    • AWARDS & HONORS
    • QUALITY POLICY
    • SEGAL AZAR MANAGERS
    • CERTIFICATE & MEMBERSHIP
  • PROJECT
    • WATER/WASTEWATER
    • OIL & GAS
    • BUILDING & CONSTRUCTION
    • INSTALLATION & EQUIPMENT
    • ROAD & RUNAWAY
  • CAPABILITY
    • HUMAN RESOURCE
    • EQUIPMENT & MACHINERY
  • EXCELLENCE & IMPROVEMENT
    • HSE
    • Research & Development (R&D)
    • SOCIAL RESPONSIBILITY
  • SEGALAZAR GROUP
    • SEGAL AZAR CONSULTING
    • SEGAL AZAR TOURISM DEVELOPMENT
    • AMIGH PEY PARS Co
    • RAVAN SAZAN AZAR Co.
  • NEWS
    • NEWS
    • READING
  • CONTACT US
    • CONTACT SEGAL AZAR
    • COMMENTS FORM
    • JOB OPPORTUNITIES
  • Download
  • EnglishEnglish
  • فارسیفارسی
Redirecting 4323 meter long underground 42 inched pipeline of heavy crude oil in the vicinity of Ramshir embankment dam via PC method
segalazar
  • HOME
  • ABOUT US
    • HISTORY
    • Board of directors
    • AWARDS & HONORS
    • QUALITY POLICY
    • SEGAL AZAR MANAGERS
    • CERTIFICATE & MEMBERSHIP
  • PROJECT
    • WATER/WASTEWATER
    • OIL & GAS
    • BUILDING & CONSTRUCTION
    • INSTALLATION & EQUIPMENT
    • ROAD & RUNAWAY
  • CAPABILITY
    • HUMAN RESOURCE
    • EQUIPMENT & MACHINERY
  • EXCELLENCE & IMPROVEMENT
    • HSE
    • Research & Development (R&D)
    • SOCIAL RESPONSIBILITY
  • SEGALAZAR GROUP
    • SEGAL AZAR CONSULTING
    • SEGAL AZAR TOURISM DEVELOPMENT
    • AMIGH PEY PARS Co
    • RAVAN SAZAN AZAR Co.
  • NEWS
    • NEWS
    • READING
  • CONTACT US
    • CONTACT SEGAL AZAR
    • COMMENTS FORM
    • JOB OPPORTUNITIES
  • Download
  • EnglishEnglish
  • فارسیفارسی
Hide Search Field
Show Search Field

.:: Redirecting 4323 meter long underground 42 inched pipeline of heavy crude oil in the vicinity of Ramshir embankment dam via PC method ::.

  • English
  • فارسی
  • Related Projects

    • Dismantling the flare (2501), construction and reinstalling
    • Complete construction of three bitumen tank units with loading facilities
    • Construction and equipment of asphalt unit of Tabriz oil refinery company
    • Establishment of manifolds and control room of Parsi Cluster separation complex

    Back to Previous Page

    Category : OIL & GAS

    Redirecting 4323 meter long underground 42 inched pipeline of heavy crude oil in the vicinity of Ramshir embankment dam via PC method
    Project title Redirecting 4323 meter long underground 42 inched pipeline of heavy crude oil in the vicinity of Ramshir embankment dam via PC method
    Contractee National Iranian South Oil Company
    Date & Location Ramshir,Khuzestan provine-2006
    Materials supply, transport and piping with 42 inched steel pipes in 6.2 km long – establishment of split ponds, transmitter and receiver of 42 inched pig for six devices – passing the pipe beneath different buildings and Jarahi Riverbed – supply and installation of the valves and associated accessories – implementation of cathodic protection system
    Share post on social media ...
    Quick Links
    • HOME
    • ABOUT US
    • PROJECT
    • CAPABILITY
    • EXCELLENCE & IMPROVEMENT
    • SEGALAZAR GROUP
    • NEWS
    • CONTACT US
    • Download
    • EnglishEnglish
    • فارسیفارسی
    Latest Projects
    Repair of buildings,Electrical and mechanical infrastructure,Flight factors and airport landscaping of Shahid Madani Airport
    Repair of buildings,Electrical and mechanical infrastructure,Flight factors and airport landscaping of Shahid Madani Airport
    Tabriz,East Azerbaijan Province-2018
    Read More
    Dismantling the flare (2501), construction and reinstalling
    Dismantling the flare (2501), construction and reinstalling
    Tabriz,East Azerbaijan Province-2019
    Read More
    Complete construction of three bitumen tank units with loading facilities
    Complete construction of three bitumen tank units with loading facilities
    Tabriz,East Azerbaijan Province-2019
    Read More
    ارتباط با ما

    تبریز، ولی عصر، خیابان پروین اعتصامی، میدان تجارت جهانی، خیابان صفا، برج WTC، طبقه یازدهم

    041-33660066


    041-33660066 (202)


    51578-49617


    segalazar@gmail.com


    Quick Links

    • HOME
    • ABOUT US
    • PROJECT
    • CAPABILITY
    • EXCELLENCE & IMPROVEMENT
    • SEGALAZAR GROUP
    • NEWS
    • CONTACT US
    • Download
    • EnglishEnglish
    • فارسیفارسی

    Latest Projects

    Repair of buildings,Electrical and mechanical infrastructure,Flight factors and airport landscaping of Shahid Madani Airport
    Repair of buildings,Electrical and ...
    Tabriz,East Azerbaijan Province-2018
    Read More
    Dismantling the flare (2501), construction and reinstalling
    Dismantling the flare (2501), const ...
    Tabriz,East Azerbaijan Province-2019
    Read More
    Complete construction of three bitumen tank units with loading facilities
    Complete construction of three bitu ...
    Tabriz,East Azerbaijan Province-2019
    Read More

    Contact SegalAzar

    تبریز، ولی عصر، خیابان پروین اعتصامی، میدان تجارت جهانی، خیابان صفا، برج WTC، طبقه یازدهم


    041-33660066

    041-33660066 (202)

    51578-49617

    segalazar@gmail.com

    Menu
    Copyright © 1398 SegalAzar.com
    Top