• HOME
  • ABOUT US
    • HISTORY
    • Board of directors
    • AWARDS & HONORS
    • QUALITY POLICY
    • SEGAL AZAR MANAGERS
    • CERTIFICATE & MEMBERSHIP
  • PROJECT
    • WATER/WASTEWATER
    • OIL & GAS
    • BUILDING & CONSTRUCTION
    • INSTALLATION & EQUIPMENT
    • ROAD & RUNAWAY
  • CAPABILITY
    • HUMAN RESOURCE
    • EQUIPMENT & MACHINERY
  • EXCELLENCE & IMPROVEMENT
    • HSE
    • Research & Development (R&D)
    • SOCIAL RESPONSIBILITY
  • SEGALAZAR GROUP
    • SEGAL AZAR CONSULTING
    • SEGAL AZAR TOURISM DEVELOPMENT
    • AMIGH PEY PARS Co
    • RAVAN SAZAN AZAR Co.
  • NEWS
    • NEWS
    • READING
  • CONTACT US
    • CONTACT SEGAL AZAR
    • COMMENTS FORM
    • JOB OPPORTUNITIES
  • Download
  • EnglishEnglish
  • فارسیفارسی
Executive operation of secondary irrigation and drainage network of Dariun 3 district in Mianab of Shooshter (preparation and installation of canal-let)
segalazar
  • HOME
  • ABOUT US
    • HISTORY
    • Board of directors
    • AWARDS & HONORS
    • QUALITY POLICY
    • SEGAL AZAR MANAGERS
    • CERTIFICATE & MEMBERSHIP
  • PROJECT
    • WATER/WASTEWATER
    • OIL & GAS
    • BUILDING & CONSTRUCTION
    • INSTALLATION & EQUIPMENT
    • ROAD & RUNAWAY
  • CAPABILITY
    • HUMAN RESOURCE
    • EQUIPMENT & MACHINERY
  • EXCELLENCE & IMPROVEMENT
    • HSE
    • Research & Development (R&D)
    • SOCIAL RESPONSIBILITY
  • SEGALAZAR GROUP
    • SEGAL AZAR CONSULTING
    • SEGAL AZAR TOURISM DEVELOPMENT
    • AMIGH PEY PARS Co
    • RAVAN SAZAN AZAR Co.
  • NEWS
    • NEWS
    • READING
  • CONTACT US
    • CONTACT SEGAL AZAR
    • COMMENTS FORM
    • JOB OPPORTUNITIES
  • Download
  • EnglishEnglish
  • فارسیفارسی
Hide Search Field
Show Search Field

.:: Executive operation of secondary irrigation and drainage network of Dariun 3 district in Mianab of Shooshter (preparation and installation of canal-let) ::.

  • English
  • فارسی
  • Related Projects

    • Executive operation of water transmission from Aras river to Yekanat and relevant reservoir & P
    • Implementation of second part of RMC canal and the main pipelines of civil areas of Agh Chay plan
    • Implementation of water transmission line from Karam Abad dam and irrigation and drainage network of
    • Establishment of main canal of Khoda Afarin and associated technical buildings

    Back to Previous Page

    Category : WATER/WASTEWATER

    Executive operation of secondary irrigation and drainage network of Dariun 3 district in Mianab of Shooshter (preparation and installation of canal-let)
    Project title Executive operation of secondary irrigation and drainage network of Dariun 3 district in Mianab of Shooshter (preparation and installation of canal-let)
    Contractee Water and power organization of Khuzestan
    Date & Location Shooshtar,Khuzestan provine-2010
    Preparation, construction and installation of grade 3 canals with half pipe oval sections and the associated accessories (canal-lets) 14.68 km long – establishment of grade 3 drainage with length of 52.36 km – establishment of technical buildings of the canal-lets and drainages.
    Share post on social media ...
    Quick Links
    • HOME
    • ABOUT US
    • PROJECT
    • CAPABILITY
    • EXCELLENCE & IMPROVEMENT
    • SEGALAZAR GROUP
    • NEWS
    • CONTACT US
    • Download
    • EnglishEnglish
    • فارسیفارسی
    Latest Projects
    Repair of buildings,Electrical and mechanical infrastructure,Flight factors and airport landscaping of Shahid Madani Airport
    Repair of buildings,Electrical and mechanical infrastructure,Flight factors and airport landscaping of Shahid Madani Airport
    Tabriz,East Azerbaijan Province-2018
    Read More
    Dismantling the flare (2501), construction and reinstalling
    Dismantling the flare (2501), construction and reinstalling
    Tabriz,East Azerbaijan Province-2019
    Read More
    Complete construction of three bitumen tank units with loading facilities
    Complete construction of three bitumen tank units with loading facilities
    Tabriz,East Azerbaijan Province-2019
    Read More
    ارتباط با ما

    تبریز، ولی عصر، خیابان پروین اعتصامی، میدان تجارت جهانی، خیابان صفا، برج WTC، طبقه یازدهم

    041-33660066


    041-33660066 (202)


    51578-49617


    segalazar@gmail.com


    Quick Links

    • HOME
    • ABOUT US
    • PROJECT
    • CAPABILITY
    • EXCELLENCE & IMPROVEMENT
    • SEGALAZAR GROUP
    • NEWS
    • CONTACT US
    • Download
    • EnglishEnglish
    • فارسیفارسی

    Latest Projects

    Repair of buildings,Electrical and mechanical infrastructure,Flight factors and airport landscaping of Shahid Madani Airport
    Repair of buildings,Electrical and ...
    Tabriz,East Azerbaijan Province-2018
    Read More
    Dismantling the flare (2501), construction and reinstalling
    Dismantling the flare (2501), const ...
    Tabriz,East Azerbaijan Province-2019
    Read More
    Complete construction of three bitumen tank units with loading facilities
    Complete construction of three bitu ...
    Tabriz,East Azerbaijan Province-2019
    Read More

    Contact SegalAzar

    تبریز، ولی عصر، خیابان پروین اعتصامی، میدان تجارت جهانی، خیابان صفا، برج WTC، طبقه یازدهم


    041-33660066

    041-33660066 (202)

    51578-49617

    segalazar@gmail.com

    Menu
    Copyright © 1398 SegalAzar.com
    Top