Dismantling the flare (2501), construction and reinstalling
Complete construction of three bitumen tank units with loading facilities
Construction and equipment of asphalt unit of Tabriz oil refinery company
Establishment of manifolds and control room of Parsi Cluster separation complex
Establishment of 15 km of 12 inched over ground pipeline between 40 miles to EPC Mahshahr Liquefied Petroleum Gas refinery
Implementation of mechanical works of the project for collection and annihilation of polluting gases (RTo) of ABS unit of Tabriz Petrochemical complex
Construction, installation and commissioning of the equipment for the Oil mixing project at Tabriz oil refinery company
Redirecting 4323 meter long underground 42 inched pipeline of heavy crude oil in the vicinity of Ramshir embankment dam via PC method
041-33660066
041-33660066 (202)
51578-49617
segalazar@gmail.com